Roy Lengweiler  
CassimatisFaesslerFellerKleinLengweilerWinkler
bridgelab




  Roy Lengweiler is an independent structural engineer specialised in design and execution of cable stayed bridges.
  After a profound phase of conception, design and construction engineering at the headquarter of a leading stay
  cable company he implemented his know-how on site at mayor recent landmark projects such as Rama VIII Bridge
  in Bangkok, Sheikh Zayed Bridge in Abu Dhabi among others.
  Roy Lengweiler is a founding member of the bridgelab network.
  • Structural Design
    • Bridge Structures
    • Concrete, Steel and Composite

  • Construction Engineering
    • Erection Schemes
    • Stage by Stage Analysis

  • Specialities
    • Stay Cable Technology
    • Strand by Strand Installation
                 Sheikh Zayed Bridge, Abu Dhabi
Binh Bridge, Haiphong Vietnam                  Rama VIII Bridge, Bangkok Thailand
                 Wadi Leban, Saudi Arabia
Batam Tonton Bridge, Indonesia                 
                                           Curriculum Vitae - References - Contact - How to reach swiss made
                          Cable Stayed Bridges  Arch Bridges 1  Suspension Bridges  Arch Bridges 2  Truss Bridges  Sprengwerk  Buildings  Cable Stayed Roof Structures  Continuos Box Girders  Heavy Lifting  Balanced Cantilever  Incremental Launching  Housing
                                                                        deutsch   english
Roy Lengweiler, dipl. Ing. ETH/SIA - Fluh 74, CH-3204 Rosshäusern - +41 31 751 00 70 t - +97 15 0624 5150 m